The exact requirements of your utility, encoded.
Complete interconnection application packets in minutes, for solar + storage installers filing across multiple utility territories. Every deficiency notice restarts the clock on a timeline you already sold — SunDocket is being built with design partners to end that.
FIRST 5 PARTNERS · 5 FREE FILINGS · 40% OFF FOR 6 MONTHS
SD-01 · The problem
REV 2026-08-12Assembled by hand, from memory
Packets get built from tribal knowledge — old emails, last quarter's approved filing, the one coordinator who knows what this utility actually wants. When that person is out, the packet waits.
Every utility differs — and drifts
Forms, attachments, fees, and screening rules vary by territory, and they change without much announcement. What passed review last time can bounce today.
A deficiency notice restarts the clock
An incomplete packet goes to the back of the queue. The project was sold on a timeline, and the resubmit loop quietly eats it.
SD-02 · What we're building
STATUS 2026-08-12 · 0 OF 4 SHIPPEDGuided intake wizard
One structured interview collects project specs, site data, and equipment — every question mapped to a real requirement.
Utility-specific packet generation
Application forms filled to the target utility's current rules, not a generic template.
Attachments checklist + SLD template
Every attachment that utility requires, listed, plus a single-line-diagram template for your engineer to work from.
Deficiency-notice tracker
Every notice logged and worked until the open count reads zero.
SD-03 · The requirements wiki
3 SAMPLE PAGES · 10 IN RESEARCHOne page per utility — forms, fees, timelines, and attachment checklists, each with a change log because requirements drift. Free forever.
PG&E
Rule 21 pathways, the Your Projects portal, packet contents, fee structure, and review stages.
Sample page — compiled from public sources.
APS
ACC interconnection rule levels, the PowerClerk packet, PE-stamp rules, and review stages.
Sample page — compiled from public sources.
Con Edison
NY SIR tracks, screening and CESIR stages, published fees, and the application package checklist.
Sample page — compiled from public sources.
All 13 first-wave utilities are covered: PG&E, SCE, SDG&E, APS, SRP, TEP, NV Energy, Xcel, Duke, FPL, National Grid, Eversource, and Con Edison.
SD-04 · Who it's for
REV 2026-08-12Solar + storage installers
Teams filing 10–100+ applications a month across two or more utility territories. The ops manager or interconnection coordinator lives inside this problem every day.
C&I and community-solar developers
Bigger systems, more screens, higher stakes per filing — plus EV-charging deployers facing the same interconnection queue.
Design-services firms
Firms that produce plan sets and applications for installers, licensing the requirements engine to run under their own service.
SD-05 · Design partners
RECRUITING 5 PARTNERSWhat you get
- 5 free filings
- Your utilities encoded first
- 40% off list pricing for 6 months after the pilot
- Terms locked in writing
What we ask
- Requirements feedback on every packet
- A case study once the numbers are real
- A 30-minute call each month
Not ready for the pilot?
Leave an email and we'll tell you when SunDocket launches. Nothing else — see the privacy note.