Early access — SunDocket is in validation and recruiting design partners. Nothing is billed today.

Utility interconnection requirements, in one place.

One page per utility — requirements, fee structure, timelines, common deficiency causes, and a change log. Free forever. This wiki is how SunDocket proves per-utility depth.

SD-01 · Utility pages

13 UTILITIES · UPDATED 2026-08-19
Sample preview

PG&E

California · Rule 21

Rule 21 pathways, the Your Projects portal, packet contents, fee structure, and review stages.

Sample preview

APS

Arizona

ACC interconnection rule levels, the PowerClerk packet, PE-stamp rules, and review stages.

Sample preview

Con Edison

New York · SIR

NY SIR tracks, screening and CESIR stages, published fees, and the application package checklist.

Sample preview

SCE

California · Rule 21

Rule 21 pathways, the PowerClerk and GIPT portals, Solar Billing Plan handling, fees, and timelines.

Sample preview

SDG&E

California · Rule 21

Rule 21 pathways, the DIIS portal, Solar Billing Plan handling, fee structure, and published timelines.

Sample preview

SRP

Arizona · SRP Handbook (non-ACC)

SRP’s own Handbook (not the ACC rules), PowerClerk, DER classes I–IV, and the clearance path.

Sample preview

TEP

Arizona · ACC DGIR

ACC DGIR levels, TEP’s Interconnection Manual, the PowerClerk portal, and the RCP export-rate lock.

Sample preview

NV Energy

Nevada · AB 405 / NMR-405

The PowerClerk portal, NMR-405 Tier 4 rates, two 10-business-day review windows, and the PTO inspection.

Sample preview

Xcel

Colorado · Minnesota

Colorado’s DER portal and 200% Rule, Minnesota’s MN DIP tracks, fees, and stage timelines.

Sample preview

Duke

Carolinas & Florida

NCIP and Fast Track pathways, Solar Choice riders, and Florida’s tier system across NC, SC, and FL.

Sample preview

FPL

Florida · Rule 25-6.065

Rule 25-6.065 tiers, size pre-approval before install, insurance proof, and the PTO meter step.

Sample preview

National Grid

New York + Massachusetts

NYS SIR pathways upstate, the nCAP portal, and the Massachusetts DPU DG tariff — fees, clocks, packets.

Sample preview

Eversource

Massachusetts + Connecticut

PowerClerk filings in two regimes — Massachusetts DPU DG paths and Connecticut’s Fast Track tracks.

SD-02 · Beyond the first wave

RANKED BY REQUESTS

Filing somewhere else?

The first-wave thirteen are live — but they are not the whole country, and most US utilities are not here yet. Coverage is planned to reach 25 utilities by month four, and what comes next is decided by what design partners file and what gets requested here.

Tell us which utility you file with — whatever state you're in. Requests are how we rank the queue.

SD-03 · Method

REV 2026-08-12

Each page is compiled from the utility's own published requirements — tariffs, interconnection manuals, application guides, and the state rules behind them. Every page shows its sources and keeps a change log, because requirements drift and an undated claim is a liability.

Where a fee amount or form revision may have moved since our last review, the page states the structure and flags the number instead of asserting it. Always verify against the utility's current published documents before filing.

SunDocket sample pages are compiled from public sources (2026-08-12). Not legal or engineering advice. Not affiliated with any utility. Verify against the utility's current published requirements before filing. How we verify requirements →