Duke Energy packet checklist
Sample preview — compiled from public sources 2026-08-19
CL-01 · Packet contents
PRINT & CHECK OFFThe structural contents of a Duke Energy behind-the-meter packet in the Carolinas (NC/SC) and Florida. Exact forms differ by state and operating company (DEC / DEP / DEF); check every form against the current state procedures and tariff book before filing. Duke Energy Indiana, Ohio, and Kentucky are not covered by this checklist.
- Interconnection request through Duke Energy's online interconnection portal, tied to the correct operating company (DEC / DEP / DEF), account, and premise
- State-specific interconnection request application form — NCIP form set in NC, SCGIP form set in SC, tier-specific Standard Interconnection Agreement in FL confirm current revision
- Electrical one-line diagram showing point of interconnection, disconnects, overcurrent protection, and grounding
- Equipment specification sheets — certified (UL 1741) inverters and, where applicable, storage nameplate detail
- Insurance certification — part of the NC interconnection request; in FL, proof of general liability coverage for Tier 2 ($1M) and Tier 3 ($2M) listing the property address
- Externally accessible, lockable manual AC disconnect switch shown on the design where the state procedures require one (FL Tier 2/3; per NC/SC procedures for the applicable pathway)
- Billing rider election in the Carolinas — Rider RSC (Residential Solar Choice) or Rider NMB (Net Metering Bridge) while enrollment is available
- Application fee payment per the applicable state fee schedule verify current schedule
- After installation: the local jurisdiction's (AHJ) final inspection approval, submitted before permission to operate
Requirements drift. Get the changes.
When the Duke page's change log gets a new entry, we'll email you that entry. Nothing else.
Filing with Duke Energy every month?
Design partners get 5 free filings and their territory encoded first — packets produced with dual human review while the software is built.
SunDocket sample pages are compiled from public sources (2026-08-19). Not legal or engineering advice. Not affiliated with any utility. Verify against the utility's current published requirements before filing.