SCE packet checklist
Sample preview — compiled from public sources 2026-08-19
CL-01 · Packet contents
PRINT & CHECK OFFThe structural contents of an SCE behind-the-meter packet. Exact forms depend on program and configuration; every form number below should be checked against SCE's current tariff book before filing.
- Interconnection application in the correct portal — Online Interconnection Application System for Solar Billing Plan / NEM-class, GIPT for other Rule 21 — tied to the correct customer of record and service account
- Signed interconnection agreement for the program (NEM-class agreement Form 16-344 confirm current revision)
- Single-line diagram showing point of interconnection, disconnects, overcurrent protection, and grounding
- Equipment spec sheets — CEC-listed modules, inverters, and storage; UL 1741 SB / Smart Inverter Phase 2 compliance per the CPUC directive effective August 29, 2023
- Storage operating details: charging source (grid vs. PV-only), export mode, and certified power control system documentation for limited- or non-export designs
- Sizing basis: system sized to historical load, or a signed oversizing attestation (up to 150% of annual usage)
- Final electrical permit / inspection clearance from the local building department (uploaded after installation)
- Contractor license (CSLB) information
- California Solar Consumer Protection Guide disclosures for residential sales
- Application fee payment per the program's current schedule
Requirements drift. Get the changes.
When the SCE page's change log gets a new entry, we'll email you that entry. Nothing else.
Filing with SCE every month?
Design partners get 5 free filings and their territory encoded first — packets produced with dual human review while the software is built.
SunDocket sample pages are compiled from public sources (2026-08-19). Not legal or engineering advice. Not affiliated with any utility. Verify against the utility's current published requirements before filing.