SDG&E packet checklist
Sample preview — compiled from public sources 2026-08-19
CL-01 · Packet contents
PRINT & CHECK OFFThe structural contents of an SDG&E behind-the-meter packet. Exact forms depend on program and configuration; every form number below should be checked against SDG&E's current tariff book before filing.
- Interconnection application in the DIIS portal, tied to the correct customer of record and service account
- Rule 21 interconnection request form where applicable (Form 142-05203 confirm current revision)
- Signed Customer Generation / interconnection agreement for the program (Form 142-0541 confirm current revision)
- Electrical one-line (single-line) diagram showing point of interconnection, disconnects, overcurrent protection, and grounding
- Site photo requirement for Fast Track-eligible projects: a photo showing the SDG&E meter and the caution placard on the service panel
- Equipment spec sheets — CEC-listed modules, inverters, and storage
- Storage operating details: charging source (grid vs. PV-only), export mode, and certified power control system documentation for limited- or non-export designs
- Contractor license (CSLB) information
- California Solar Consumer Protection Guide disclosures for residential sales
- Application fee payment per SDG&E's invoice for the program
Requirements drift. Get the changes.
When the SDG&E page's change log gets a new entry, we'll email you that entry. Nothing else.
Filing with SDG&E every month?
Design partners get 5 free filings and their territory encoded first — packets produced with dual human review while the software is built.
SunDocket sample pages are compiled from public sources (2026-08-19). Not legal or engineering advice. Not affiliated with any utility. Verify against the utility's current published requirements before filing.