Eversource packet checklist

Sample preview — compiled from public sources 2026-08-19

Massachusetts · DPU DG standards Connecticut · PURA guidelines Last reviewed 2026-08-19 Full requirements: Eversource page

CL-01 · Packet contents — Massachusetts

PRINT & CHECK OFF

The structural contents of an Eversource Massachusetts DG interconnection packet under the DPU-approved Standards for Interconnection of Distributed Generation. Check every form against the tariff revision in force before filing.

  • Simplified or Expedited/Standard interconnection application in PowerClerk, tied to the correct customer of record and service point confirm current revision
  • Pre-application report — required for systems 250 kW AC and above
  • Single-line diagram showing the point of common coupling, disconnects, and protection
  • Equipment spec sheets — inverters meeting the IEEE 1547-series requirements Eversource publishes confirm current revision
  • Interconnection Service Agreement for Expedited and Standard projects
  • Net-metering schedule information where the project takes net metering service
  • Application fee per the fee schedule — $0 qualifying Simplified; $100–$300 small network systems; $4.50/kW (min $300, max $7,500) Expedited/Standard verify current schedule
  • Filed with the correct DG group — Eastern MA (emdg@eversource.com) or Western MA (wmdg@eversource.com)

CL-02 · Packet contents — Connecticut

PRINT & CHECK OFF

The structural contents of an Eversource Connecticut interconnection packet under the guidelines established per PURA Docket No. 03-01-15RE03, as published on Eversource's Application to Connect page.

  • Interconnection application in PowerClerk with e-signature confirm current revision
  • One-line electrical schematic
  • Site plan showing meter and AC disconnect location
  • Proof of insurance — published coverage levels vary by capacity, from $300K to $5M verify current schedule
  • Technical specification / data sheets with UL 1741 certification
  • Proof of compliance with the applicable IEEE standards
  • Guidelines acknowledgment for the correct track — inverter-based 25 kW or less, Fast Track (up to 2 MW), or Study Process (above 2 MW)
  • Application fee — $200 (≤25 kW inverter-based) / $500 (Fast Track) / $1,000 + study fees (Study Process) verify current schedule

Filing with Eversource every month?

Design partners get 5 free filings and their territory encoded first — packets produced with dual human review while the software is built.

Become a design partner

SunDocket sample pages are compiled from public sources (2026-08-19). Not legal or engineering advice. Not affiliated with any utility. Verify against the utility's current published requirements before filing.