Xcel packet checklist
Sample preview — compiled from public sources 2026-08-19
Xcel's process differs by state. Use the Colorado list for Public Service Company of Colorado territory and the Minnesota list for Northern States Power territory; Xcel's other states are not covered here yet.
CL-01 · Colorado packet contents
PRINT & CHECK OFFThe structural contents of an Xcel Colorado DER packet, per Xcel's Interconnection Application Portal process guide. Which items apply depends on program, ownership, and whether storage is included.
- Application in the Interconnection Application Portal — contact information, system details, application details, permanent premise number (temporary accounts are not permitted)
- Engineering process fee — $100 ≤ 10 kW AC / $1,000 > 10–250 kW AC / $2,000 > 250 kW–2 MW AC verify current schedule
- Application deposit fee for Solar*Rewards ($250 small / $1,500 medium verify current schedule) or Solar*Rewards Community (deposit escrow confirmation)
- One-line diagram — installer name, address, complete AC and DC system specifications; meter collar adaptor documented if used
- Site plan
- UL 1741 inverter listing
- 200% Rule support documentation when the automatic sizing check fails
- Solar Bank election form (Solar*Rewards and DG)
- Small Generator Interconnection Agreement (SGIA) for systems over 25 kW AC
- Meter collar waiver if using an approved meter collar adaptor
- Tenant and landlord release form for rental properties
- Energy storage declaration and battery details when storage is included
- At final documentation: electrical inspection approval, and the NABCEP form for Solar*Rewards applications
CL-02 · Minnesota packet contents
PRINT & CHECK OFFMinnesota applications follow the statewide MN DIP framework. Structurally, a Minnesota packet includes:
- MN DIP interconnection application for the applicable track — Simplified for certified inverter-based systems of 20 kW or less, otherwise Fast Track or Study
- Application fee — up to $100 for the Simplified track per the Minnesota PUC verify current schedule
- One-line diagram and site/system technical details, including certified (listed) inverter documentation
- Signed agreement — Uniform Statewide Contract for the smallest systems, or the MN DIA with its cost estimate, returned within 30 business days
- Net metering election for systems of 40 kW or less under Minn. Stat. § 216B.164
- Solar*Rewards Minnesota program forms if participating confirm current revision
- Proof of electrical inspection before parallel operation is authorized confirm current revision
Requirements drift. Get the changes.
When the Xcel page's change log gets a new entry, we'll email you that entry. Nothing else.
Filing with Xcel every month?
Design partners get 5 free filings and their territory encoded first — packets produced with dual human review while the software is built.